General contractors and integrators: Veraport bids Division 28 electronic security and Division 27 cabling as a subcontractor. Send the plans and the due date.
Access control, CCTV, intrusion detection, structured cabling and fiber.
Spec sections 27 and 28, security and low-voltage drawings, addenda, and the bid due date and time zone.